Residential Fixture Units

How to Calculate Residential Construction Projects

For remodel and addition permits, the same water permit process applies to calculating the fees as for new connections, except that there is no charge for exterior uses. Table I may be applied to remodels/additions in the same way new construction permits are calculated. Total the number of fixture units to be added to the property. Multiply the total by the current Capacity as shown in Rule 24 Table 3 to determine the Water Permit capacity fees.  Fees increase annually on July 1.

WP-Backgrounds by InoPlugs Web Design and Juwelier Schönmann