Table A-18. Summary of Estimated Costs for CRDRP and Selected Alternatives

Estimated Project Costs (1998 Price Levels)

Alternative

Capital Cost

O&M Costs (per year)

Total Net Present
Value *a

Average Increase in Monthly Bill for Typical Single-Family Residential User *b
CRDRP

$107,472,000

$1,641,000

$239,283,000

$18.64
10.5 MGD desalination (Marina site)*c, *d

116,460,000

9,734,000

669,557,000

$43.50
9.0 MGD desalination plus Seaside injection/recovery *d

115,487,000

8,795,000

631,238,000

$41.04
8.0 MGD desalination plus injection/recovery plus dredging Los Padres Reservoir *d

129,517,000

8,358,000

632,992,000

$41.58
7.5 MGD desalination plus injection/recovery plus dredging Los Padres Reservoir plus additional conservation/reclamation *d

135,013,000

8,162,000

631,250,000

$41.67


*a Net present value of Cal-Am revenue requirements to fund all capital and O&M costs through 90 years of project operation, assuming financing and ownership by Cal-Am. Future annual costs were brought to 1998 levels using a 5% discount rate.

*b Projected average monthly surcharge on Cal-Am bill during the first 30 years once project operation begins (years 2006-2035). Assumes average monthly use of 8 units of water (800 cubic feet or 5,984 gallons).

*c Desalination projects assume a plant located at the Marina site. Estimated capital costs at the Moss Landing site range from 35% to 37% higher. Estimated O&M costs are similar for the two sites.

*d Costs for alternative options do not include environmental mitigations (which could be costly for desalination and dredging). Costs do not include O&M costs associated with Cal-Am system improvements.