ITEM:

PUBLIC HEARING

 

13.

CONSIDER ADOPTION OF APRIL THROUGH JUNE 2020 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET

 

Meeting Date:

March 16, 2020

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

 

Prepared By:

Jonathan Lear

Cost Estimate:

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  Notice of Exemption, CEQA, Article 19, Section 15301 (Class 1)

ESA Compliance: Consistent with the September 2001 and February 2009 Conservation Agreements between the National Marine Fisheries Service and California American Water to minimize take of listed steelhead in the Carmel River and Consistent with SWRCB WR Order Nos. 95-10, 98-04, 2002-0002, and 2016-0016.

 

SUMMARY: The Board will accept public comment and take action on the April through June 2020 Quarterly Water Supply Strategy and Budget for California American Water’s (CalAm’s) Main and Satellite Water Distribution Systems (WDS), which are within the Monterey Peninsula Water Resources System (MPWRS). The proposed budgets, which are included as Exhibits 13-A and 13-B, show monthly production by source of supply that is required to meet projected customer demand in CalAm’s Main and Laguna Seca Subarea systems, i.e., Ryan Ranch, Bishop, and Hidden Hills, during the April through June 2020 period. The proposed strategy and budget is designed to maximize the long-term production potential and protect the environmental quality of the Seaside Groundwater and Carmel River Basins.

 

Exhibit 13-A shows the anticipated production by CalAm’s Main system for each production source and the actual production values for the water year to date through the end of February 2020. Cal-Am’s annual Main system production for Water Year (WY) 2020 will not exceed 10,130 acre-feet (AF). Sources available to meet customer demand are 1,820 AF from the Coastal Subareas of the Seaside Groundwater Basin as set by the Seaside Basin Adjudication Decision and 8,310 AF from the Carmel River as set by WRO 2016-16.  Additional water projects and water rights available are an estimated 800 AF from ASR Phase 1 and 2 recovery, 300 AF from the Sand City Desalination Plant, and an average of 225 AF from CalAm’s Table 13 water rights. Under Table 13 water rights, CalAm is allowed to produce water for in-basin uses when bypass flows are in excess of permit conditions. The schedule of production from the Carmel Valley Alluvial Aquifer is consistent with State Water Resources Control Board (SWRCB) Order Nos. 95-10, 98-04, 2002-0002, and 2016-0016. In compliance with WRO 2016-0016, any water diverted under these rights must be used to reduce unlawful diversion from the Carmel River Basin.

 

Exhibit 13-B shows the anticipated production by CalAm’s Laguna Seca Subarea systems for


each production source, and the actual production values for WY 2019 to date through the end of February 2020. According to the Seaside Basin Adjudication Decision, CalAm’s production has been reduced to 0 AF.  It is recognized that CalAm will need to produce water to serve its customers and this table is produced as a ministerial component of tracking the implementation of the Adjudication Decision.  CalAm has filed in the most recent general rate case with the California Public Utility Commission to intertie the main system and satellite systems to solve this issue.

 

RECOMMENDATION:  The Board should receive public input, close the Public Hearing, and discuss the proposed quarterly water supply budget. District staff recommends adoption of the proposed budget. The budget is described in greater detail in Exhibit 13-C, Quarterly Water Supply Strategy Report: April June 2020.

 

BACKGROUND:  The Water Supply Strategy and Budget prescribes production within CalAm’s Main and Laguna Seca Subarea systems and is developed on a quarterly schedule.  Staff from the District, CalAm, the National Marine Fisheries Services (NMFS), State Water Resources Control Board’s Division of Water Rights (SWRCB-DWR), and the California Department of Fish and Wildlife (CDFW) cooperatively develop this strategy to comply with regulatory requirements and maximize the environmental health of the resource system while meeting customer demand.  To the greatest extent pumping in the Carmel Valley is minimized in the summer months and the Seaside wells are used to meet demand by recovering native water and banked Carmel River water.  Also, it was agreed that CalAm will operate its wells in the Lower Carmel Valley in a downstream to upstream order.

 

If flows exceed 20 cfs at the District’s Don Juan Gage, CalAm is allowed to produce from its Upper Carmel Valley Wells, which are used to supply water for injection into the Seaside Groundwater Basin. The permitted diversion season for ASR is between December 1 and May 31. Diversions to storage for ASR will be initiated whenever flows in the river are above permit threshold values. For planning purposes, the QWB group schedules diversions to ASR storage based on operational days that would occur in an average streamflow year. CalAm may also divert under Table 13 Water Rights for in-basin use within Carmel Valley when flows are adequate.  This schedule is estimated with average year streamflow conditions and daily demand for Carmel Valley.  There is also a projected goal of producing 25 AF of treated brackish groundwater from the Sand City Desalination Plant in each of these three months.

 

Rule 101, Section B of the District Rules and Regulations requires that a Public Hearing be held at the time of determination of the District water supply management strategy. Adoption of the quarterly water supply strategy and budget is categorically exempt from the California Environmental Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class 1). A Notice of Exemption will be filed with the Monterey County Clerk's office, pending Board action on this item.

 

EXHIBITS

13-A    Quarterly Water Supply Strategy and Budget for Cal-Am Main System: January – March 2020

13-B    Quarterly Water Supply Strategy and Budget Report: January March 2020

13-C    Staff Note from the February 5, 2020 Seaside Watermaster Board Meeting

U:\staff\Boardpacket\2020\20200316\PublicHearings\13\Item-13.docx