| |
Quarterly Water Supply Strategy and Budget |
|
|
|
|
|
|
|
|
|
|
|
|
| |
July -
September 2003 |
|
|
|
| |
Proposed
Cal-Am Production Values in Acre-Feet |
|
|
|
| |
Assuming
Near Normal Inflow Conditions |
|
|
|
| |
|
|
|
|
|
|
|
| |
SOURCE |
MONTH |
|
WATER YEAR TO DATE |
|
|
|
| |
|
Jul-03 |
Aug-03 |
Sep-03 |
|
Oct-03- May-03 |
Percent |
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| |
San Clemente Reservoir |
0 |
0 |
0 |
|
242 |
2.9% |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
Carmel Valley Aquifer |
|
|
|
|
|
|
|
|
| |
Upper |
31 |
31 |
30 |
|
480 |
5.7% |
|
|
|
|
|
| |
Lower |
1,037 |
1,058 |
902 |
|
6,475 |
76.3% |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
Seaside Coastal Basin |
560 |
560 |
560 |
|
1,290 |
15.2% |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
Total Production: |
1,628 |
1,649 |
1,492 |
|
8,487 |
100.0% |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
-- Production for Distribution |
1,628 |
1,649 |
1,492 |
|
8,319 |
98.0% |
|
|
|
|
|
| |
-- Production for Injection |
0 |
0 |
0 |
|
168 |
2.0% |
|
|
|
|
|
| |
|
|
Total |
8,487 |
100.0% |
|
|
|
|
|
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
Notes: |
|
|
|
|
|
| |
1. The Budget reflects below normal inflow
conditions at the San Clemente Dam site. |
|
|
|
| |
2. The period for reporting corresponds to the
Water Year, which begins on October 1 and ends on September 30 |
|
|
| |
of the following
year. |
|
|
|
| |
3. Anticipated annual production is based on
annual Cal-Am production of 15,285 acre-feet from the Cal-Am |
|
|
|
| |
system, including 4,000 AF from the
Seaside Basin, and 11,285 AF from the Carmel River Basin. |
|
|
|
| |
Monthly production was calculated by
multiplying total annual production times the average fraction |
|
|
|
| |
of annual production for each month
(based on production data from 1988 to 1997). |
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|