NOTES:
1. Shaded areas indicate
production within the Carmel river watershed
2. Source areas are as
follows:
AS1 - UPPER
CARMEL VALLEY - San Clemente Dam to Esquiline Bridge
AS2 - MID CARMEL VALLEY -
Esquiline Bridge to Narrows
AS3 - LOWER CARMEL VALLEY - Narrows to Via Mallorca Bridge
AS4 - LOWER CARMEL VALLEY -
Via Mallorca Bridge to Lagoon
CVA - CARMEL VALLEY AQUIFER (Sum of AS1, AS2, AS3 AS4)
SCB - SEASIDE COASTAL
BASINS
CAC - CACHAGUA CREEK
and UPPER WATERSHED AREAS
CVU - CARMEL VALLEY UPLAND -
Hillsides and Tularcitos Creek Area
LSS - LAGUNA SECA SUBAREA (RRA
- Ryan Ranch Area is within LSS)
MIS - PENINSULA, CARMEL
HIGHLANDS AND SAN JOSE CREEK AREAS
3. Before 1999, production
from "Bishop Ranch Water Distribution System" was included, as the System was acquired
by
Cal-Am in July 1998.
4. The Reporting
Year runs from July 1 through June 30, the Water Year runs from October 1
through September 30. The reporting
period was modified to correspond to
the Water
Year in 2002.
|