EXHIBIT
3-A
22.5.18 Los Padres Dam Long-Term Plan Project (115-400101)
CAW REQUEST: $200,000 in 2015, $350,000
in 2016, and $450,000 in 2017 to conduct a detailed feasibility study "to
determine the ultimate fate of the Los Padres Dam."
ORA POSITION: ORA takes no position on
this project.
MPWMD POSITION: MPWMD
basically believes that CAW's question of "Is the Carmel River better with
or without the Los Padres Dam?" is overly simplified and proposes that it
is in a better position to conduct the study rather than CAW.
RESOLUTION: After
review of supplemental information provided by MPWMD during settlement
discussions, the parties agree that CAW will co-fund MPWMD so they may pursue on-going
efforts and studies as described below to determine the best overall fate for
the Los Padres Dam and Cannel River. CAW will contribute up to $1,000,000 minus
CAW staff time of $24,000 per year to assist MPWMD. Furthermore, the parties
also agree that this study should not be capitalized, but that it shall be
expensed as follows: $200,000 in 2015; $350,000 in 2016; and $450,000 in 2017.
Studies will include evaluating upstream steelhead passage at Los Padres Dam,
whether the Carmel River is better or worse with surface storage at Los Padres
Dam, and what options exist to maintain physical existing surface storage in
Los Padres Reservoir (i.e., manage annual sediment inflow to the reservoir).
Also included in the studies would be an analysis of the potential geomorphic
effects of a resumption or increase of the natural flow of sediment.
REFERENCES: Exh. 2, CAW Schubert Direct, pp. 117-119; Exh. 2-A,
CAW Schubert Rebuttal, p. 94, pp. 156-158; Exh. 15 and IS-A, ORA Mendai Lau
Direct, ORA Report No.3, p. 5-43; MPWMD Stoldt Direct, p. 10,
lines 3 -9; Ex. 33, MPWMD Hampson Direct, p. 12 -18.