ITEM:

ACTION ITEM

 

16.

RECEIVE AND CONFIRM WATER SUPPLY FORECAST FOR PERIOD OF MAY 1, 2015 -- SEPTEMBER 30, 2016; ADOPT RESOLUTION 2015-08 TO AMEND RATIONING TABLE (XV-4)

 

Meeting Date:

May 18, 2015

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

Prepared By:

David J. Stoldt

 Cost Estimate: 

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  N/A

 

SUMMARY:  Regulation X of the Monterey Peninsula Water Management District (District) Rules and Regulations requires that a water supply summary forecast report be compiled annually to analyze the status of water supply and demand within the District.  This report quantifies rainfall, runoff, and storage conditions within the District as of May 1, 2015, and forecasts the amount of water that will be available for use during the upcoming water year. 

 

Physical Water Availability:  As of May 1, 2015, usable water storage within the Monterey Peninsula Water Resource System (MPWRS) totaled 30,990 acre-feet (AF) or 82% of maximum storage capacity.  A map of the MPWRS is included as Exhibit 16-A.  A breakdown of total storage by reservoir and aquifer is shown in Exhibit 16-B.  As shown, usable reservoir storage totals 1,670 AF and usable aquifer storage totals 35,970 AF.  Note that the storage summary does not include usable storage in the Northern Inland and Laguna Seca Subareas of the Seaside Groundwater Basin.  In addition, a summary of other water-supply related conditions within the MPWRS -- rainfall, runoff, and number of adult steelhead recorded at San Clemente Dam, and California American Water (Cal-Am) monthly diversions from the Carmel River and Seaside Groundwater Basins relative to limits set by the State Water Resources Control Board (SWRCB) and Court -- are shown in Exhibit 16-C and 16-D.

 

The amount of carryover storage that is needed to meet the projected water needs within the District for the remainder of Water Year (WY) 2015 and all of WY 2016 is shown in Exhibit 16-E.  These projections include the water needs of both Cal-Am customers and non Cal-Am water users within the District who rely on water from the MPWRS.  As shown, the projected water demand for the remainder of WY 2015 is 9,017 AF.  Similarly, the projected demand for WY 2016 is 15,169 AF. These projections are based on the maximum annual production amount for the Cal-Am main system from the Carmel River Basin directed by the SWRCB in Order WR 2009-0060 (9,945 AF in WY 2015 and 9,824 AF in WY 2016), the maximum annual production amount for Cal-Am from the Seaside Groundwater  Basin specified by the Court as a result of the Seaside Basin adjudication and amended by the Seaside Watermaster on November 30, 2011 (2,299 AF in WY 2015 and 2,299 AF in WY 2016), and the maximum production amount for non Cal-Am users in the MPWRS specified in the District’s Water Allocation Program (3,046 AF).


As shown in Exhibit 16-E, the total amount of water needed on May 1 to meet the projected water demand for the remainder of WY 2015 and all of WY 2016 is 24,168 AF.  Given the current usable storage estimate of 30,990 AF, there is sufficient stored water in the MPWRS to meet the projected water needs for the remainder of WY 2015 and begin WY 2016 with a full year’s supply in reserve.  This is consistent with the District drought protection goal approved by the Board in August 1993.

 

It should also be noted that this approach is conservative in that it is based entirely on storage and does not include any allowance for surface and subsurface inflows that are expected to occur.  Therefore, based on the physical availability of water, no mandatory water demand reductions, i.e., rationing actions, are required at this time.  It should be noted, however, that this analysis does not incorporate environmental considerations such as effects on riparian and aquatic resources or regulatory restrictions. 

 

Note that all water users within the District are presently under Stage 1 Water Conservation which prohibits water waste and all non-essential uses of water.

 

Community Water Demand:   For WY 2015, as of May 1, 2015, Cal-Am had produced 5,442 AF of water from its sources in the MPWRS to serve its customers.  This amount of production is 764 AF under the year-to-date at month-end production target that had been set for Cal-Am based on SWRCB Order WR 2009-0060 and the Seaside Groundwater Basin adjudication decision. 

 

RECOMMENDATION:   The Board should receive the water supply forecast for the May 1, 2015 through September 30, 2016 period and adopt Resolution 2015-07 to amend Rationing Table (XV-4).

 

IMPACTS ON STAFF/RESOURCES:  District staff currently tracks and reports on water production and water supply conditions on a monthly basis; no additional impacts are anticipated related to this item.

 

EXHIBITS

16-A    Map of the Monterey Peninsula Water Resources System (MPWRS)

16-B    Water Storage Conditions, MPWRS

16-C    MPWMD Water Supply Status -- May 1, 2015

16-D    California American Water Production Distributed by Associated Water Rights:  Water Year 2015

16-E    Derivation of Water Rationing Triggers for the MPWRS for the Remainder of 2015 Water Year and all of 2016 Water Year

16-F    Draft Resolution 2015-07

 

 

U:\staff\Boardpacket\2015\20150518\ActionItems\16\Item 16.docx