WATER SUPPLY STRATEGY AND BUDGET JANUARY-MARCH 2006
 Carmel River Reservoirs: Diversion and Release Schedule Assuming Normal Inflow Conditions2
            (All Values in Acre-Feet, except as indicated)
                                 
  Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-00 Nov-00 Dec-00  
Los Padres Reservoir                            
   Inflow 415 437 1,229 3,647 4,846 5,887             201 501 1,666  
   Outflow                                
          Evaporation 18 8 6 6 9 15             11 6 5  
          Spillage 0 0 0 2,563 4,262 5,257             0 0 0  
          Release (Fish Ladder) 590 530 615 615 575 615             393 405 461  
          Release (Outlet) 0 0 0 0 0 0             0 0 0  
          Release (Notch) 0 0 0 0 0 0             0 0 0  
   Total Storage                                
         Beginning of Month 792 599 498 1,106 1,569 1,569             0 0 90  
         End of Month 599 498 1,106 1,569 1,569 1,569             0 90 1,290  
                                 
Between  Reservoirs                                
    Inflow 44 31 307 912 1,211 1,472             117 74 284  
    Outflow                                
         Evapotranspiration 28 20 16 21 26 37             37 21 16  
         Private Usage 5 -18 2 2 2 2             5 2 2  
                                 
San Clemente Reservoir                                
   Inflow 601 559 904 4,067 6,020 7,305             468 455 727  
   Outflow                                
          Evaporation 7 3 6 6 9 15             6 7 6  
          Spillage 0 0 0 3,934 5,955 7,228             37 180 198  
          Diversion (Filter Plant) 0 0 0 0 0 0             31 30 31  
          Release (Valve) 0 0 0 0 0 0             63 59 123  
          Release (Six Ports) 410 378 713 0 0 0                    
          Release ( Fish Ladder) 123 119 123 0 0 0             123 119 307  
          Leakage 61 59 61 61 56 61             61 59 61  
    Total Storage                                
         Beginning of Month 71 71 71 71 137 137             0 147 147  
         End of Month 71 71 71 137 137 137             147 147 147  
                                 
   Total Release 594 556 898 3,996 6,011 7,290             285 418 690  
   Mean Daily Release in cfs  9.7 9.4 14.6 65 108 119             4.6 7.0 11.2  
   Mean Daily Diversion in cfs 0.0 0.0 0.0 0.0 0.0 0.0             0.5 0.5 0.5  
   Mean Daily Diversion in cfs (Russell Wells) 0.5 0.5 0.5 0.9 0.9 0.9             1.4 1.4 1.4  
                                 
Notes:                                
1.  The minimum pool requirements at Los Padres and San Clemente Reservoirs are 91 acre-feet @ elevation 980 ft and 71 acre-feet @ elevation 515 ft, respectively.
2.  Projected inflow for the December 2005 through March 2006 period is based on the expectation that unimpaired flows at San Clemente Dam will equal the 62.5% exceedance values for reconstructed unimpaired monthly historical flows (WY1902-2005) and represents the low end of normal range of water years.
3.  Calculated inflow to San Clemente Reservoir is distributed 80% above Los Padres Dam and 20% between Los Padres and San Clemente Dams.
4.  Estimated evaporation is based on average monthly reservoir surface area and gross monthly evaporation rates developed by  US Army Corps of Engineers (1981).
5.  Releases and diversions are consistent with terms of the 2001 Conservation Agreement between the NOAA Fisheries and California-American Water, and with the conditions in SWRCB Order WRO  2002-0002.