EXHIBIT 19-B
                     
Monthly Cal-Am Diversions from Carmel River and Seaside Ground Water Basins: Water Year 2005  
(All Values in Acre-Feet)  
 
Water Year   Carmel River   Seaside Groundwater   System   Year-to-Date  
2005   Basin   Basin   Total   Target Actual  
 
Oct-04 716 431 1,147 1,379 1,147  
Nov-04 736 202 938 2,492 2,085  
Dec-04 636 301 937 3,476 3,022  
Jan-05 844 26 870 4,434 3,892  
Feb-05 804 0 804 5,328 4,696  
Mar-05 919 0 919 6,375 5,615  
Apr-05 979 0 979 7,584 6,594  
May-05 1,067 220 1,287 8,989 7,881  
Jun-05 1,015 406 1,421 10,516 9,302  
Jul-05 998 516 1,514 12,144 10,816  
Aug-05 13,793  
Sep-05 15,285  
Total    8,714   2,102   10,816        
 
Source: California American Water  
Text Box: Notes:
1. Under SWRCB Order No. WR 95-10, Cal-Am is limited to 11,285 acre-feet of diversions from the Carmel River Basin. 
2. Under the current MPWMD water supply budget, Cal-Am is limited to 4,000  acre-feet of diversions from the coastal subareas of the Seaside Ground Water Basin. This level of diversions is consistent with SWRCB Order No. WR 95-10, which directed Cal-Am to maximize its production from the Seaside Basin within the estimated long-term yield of the basin.
3. District-wide, Cal-Am's main system is limited to 15,285 acre-feet of diversions.
4. Carmel River diversions are reduced for diversions that are injected into the Seaside Ground Water Basin.  During WY 2005,  
351 acre-feet of water have were diverted from the Carmel River Basin for injection into the Seaside Ground Water Basin.
 
 
 
 
 
 
 
 
 
/u/staff/word/boardpacket/2005/2005boardpacket/20050815/InfoItems/19/item19_exh19b.xls