Monterey Peninsula Water Supply Project Governance Committee |
|||
|
|
||
Meeting Date: |
August 25, 2014 |
||
|
|
|
|
Agenda Item: |
3. |
Receive Report, Discuss and Provide Direction on the Value Engineering
Final Report for the Cal Am Desalination Facility |
|
|
|
||
Summary: |
The Final
Value Engineering (VE) Study for the Monterey Peninsula Water Supply Project
is attached as Exhibit 3-A. The study was presented to the Monterey Peninsula
Regional Water Authority (MPRWA) on August 14, 2014. The MPRWA discussed the VE Study and
directed staff to contract with SPI on preparation of an analysis of the
assumptions and recommendations in the VE Study, for review and action by the
MPRWA on September 11, 2014. The SPI
analysis and the MPRWA recommendation on the Final VE Study should be
forwarded to the Governance Committee for action at its September 17, 2014
meeting. |
||
|
|
||
Action: |
The Governance
committee should review the Final VE Study, receive a report from California
American Water, take public comment and then determine if there are questions
or issues raised in the report that should be analyzed by SPI. |
||
|
|
||
Discussion: |
The VE
Study for 30% design of the desalination facility focuses on value
improvements, in particular potential cost savings. Requirements mandated by the settlement
agreements, as well as directions from the Governance Committee on environmental
and aesthetic issues, should still be incorporated into the design. The additional SPI analysis will be awarded
by MPRWA, which authorized up to $5,000 to fund the report. |
||
|
|
||
Exhibits: |
|
||
Final Value
Engineering Study – Monterey Peninsula Water Supply Project Desalination
Plant – August 2014 |
|||
|
|
||